Close Menu
New Press
    Facebook X (Twitter) Instagram
    New Press
    • Home
    • National
    • International
    • Politics
    • Campus
    • Game
    • Entertainment
    New Press
    News

    Barapukuria Thermal Power Plant Resumes Production

    By DMN DeskApril 25, 2026 6:13 AMNo Comments1 Min Read
    Share Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Copy Link


    0

    Production at Dinajpur’s Barapukuria Thermal Power Plant has resumed after a prolonged 48-hour shutdown caused by mechanical faults. The plant recommenced operation today, Friday (April 24).

    Last Wednesday (April 22), around 10 PM, Unit 1, with a production capacity of 125 megawatts, shut down. This halted production across all three units of the thermal power plant, leading to power outages in Dinajpur and 8 other northern districts.

    Prior to this incident, Unit 2, with a capacity of 125 megawatts, and Unit 3, with a capacity of 275 megawatts, of the same power plant had already been shut down for a long period.

    It is noteworthy that the coal-fired Barapukuria Thermal Power Plant was established next to the Barapukuria coal mine in Dinajpur in 2006, utilizing coal produced from the mine. Initially, two units, each with a production capacity of 125 megawatts, totaling 250 megawatts, were installed.

    Subsequently, in 2017, another unit with a 275-megawatt production capacity was launched, increasing the plant’s total capacity to 525 megawatts. However, due to mechanical faults and various other complexities, the power plant has never been able to produce electricity at its full 525-megawatt capacity simultaneously.



    Source link

    Share. Facebook Twitter LinkedIn Email Copy Link
    Previous ArticleAir Defense System Suddenly Activated in Tehran
    Next Article Two More Ships Arrive at Chattogram Port with Over 68,000 Tons of Diesel

    Related Posts

    Prime Minister Directs Qurbani Waste Removal Within 12 Hours: Home Minister

    May 5, 2026 12:39 AM

    PM Holds Meeting to Restart Closed Mills

    May 4, 2026 7:56 PM

    Record 17 Deaths from Measles and Suspected Cases in 24 Hours

    May 4, 2026 5:34 PM
    Latest News

    Prime Minister Directs Qurbani Waste Removal Within 12 Hours: Home Minister

    PM Holds Meeting to Restart Closed Mills

    Record 17 Deaths from Measles and Suspected Cases in 24 Hours

    BJP Leads in West Bengal, Mamata’s Trinamool Faces Threat of Ending 15-Year Rule

    49 MPs for Reserved Women’s Seats Sworn In

    Honesty-Efficiency Will Be the Policy for Promotion and Transfer in Public Administration: Prime Minister

    Facebook X (Twitter) Instagram
    © 2026 New Press

    Type above and press Enter to search. Press Esc to cancel.